Installation process of washbasin installation pre

2022-07-22
  • Detail

In the bathroom decoration, the installation of washbasin is the top priority, because when we check in, we will use washbasin every day, and the quality of washbasin installation directly affects our use effect. Today, I will take a look at the installation process and precautions of washbasin with Xiaobian for your reference

in bathroom decoration, the installation of washbasin is the top priority, because when we check in, we will use washbasin every day, and the quality of washbasin installation directly affects our use effect. Today, I will take a look at the installation process and precautions of washbasin with Xiaobian for your reference

installation process of washbasin

1. Water supply and drainage pipelines have been reserved before installation, and the steel support supporting the washbasin table has also been installed

2. The decoration unit shall finish polishing the opening of the table according to the cutting drawing of the table in the packing box of the basin under the table

3. Cut the faucet mounting hole correctly according to the installed faucet and table size

4. Temporarily put the washbasin into the installation opening of the opened table, check the gap and make a mark

5. After inspection and verification, put the washbasin flat, apply silicone sealing material on the upper mouth of the edge of the washbasin, carefully put the washbasin under the table, align it with the installation hole, align it with the previous mark and press it upward, and use the connecting piece of the washbasin and the table attached by the manufacturer to closely connect the washbasin and the table

6. After the sealant hardens, install the faucet on the table according to the requirements and steps in the manual; Connect water inlet and drainage pipe fittings

precautions for washbasin installation

1. Install the washbasin

install the pipe rack washbasin, draw a vertical line according to the middle position of the sewer nozzle, measure the specified height from the ground upward, draw a horizontal line on the wall, draw a mark on the wall according to the width of the washbasin, and punch a hole with a diameter of 120 mm deep

wash away the brick slag and other sundries in the hole from the water, insert the expansion bolt into the hole, twist it firmly with cement, hang the fine basin pipe rack, cover the rubber pad and eye ring on the bolt, take the nut, and screw it until the tightness is moderate, and the end of the pipe rack exceeds the fixed hole of the washbasin. Put the washbasin on the rack and level it, weld a horizontal iron bar on the bolt with a diameter of 4mm, insert the upper end into the fixing hole, and the lower end into the pipe rack, put on the nut, and screw it to a proper tightness

2. Install the cast iron frame washbasin

draw a vertical line according to the center of the sewer pipe orifice, measure the specified height from the ground upward, draw a horizontal line into a cross line, draw a mark on the horizontal line according to the width of the washbasin, and then draw a vertical line respectively, place the basin frame, and draw the screw hole in the hole with a diameter of 15 mm and a length of 70 mm. Cut the lead sheet into rolls into the hole, fix the basin frame on the wall with screws, put the washbasin on the frame, open the bolts of the movable frame, pull out the movable frame, hook the frame in the basin hole, tighten the screws of the movable frame, and level and align

here is the relevant information about the installation of washbasins. I hope this article will be helpful to you. If there is anything else you don't understand, you can leave a message to Xiaobian below, and we will answer it for you as soon as possible