China's speed in the hoisting field of the hottest

2022-08-12
  • Detail

"China speed" in the field of Jianglu tower crane creation engineering hoisting

Jianglu tower crane creation engineering hoisting "China speed"

China Construction machinery information

director fetscher added: the news of building a 30 story building in Xiangyin County, Hunan Province in 15 days has recently been crowned the title of China speed by the British media. In this landmark project, QTZ400 tower crane produced by Jianglu Electromechanical group company of China North Industries Group Co., Ltd. served as the core hoisting and splicing task. This building on the seismic test methods JGJ 101 (9) 6 caused a heated discussion of the building

the news that a 30 story building was built in Xiangyin County, Hunan Province in 15 days has recently been dubbed "China speed" by the British media. In this landmark project, QTZ400 tower crane produced by Jianglu Electromechanical group company of China North Industries Group Co., Ltd. served as the core hoisting and splicing task

located in caoxigang industrial new area, Xiangyin County, this building, which caused heated discussion at the, has a total construction area of 17000 square meters and was completed in only 15 days, that is, 360 hours. The core of this new building product is the use of "all steel modular construction technology". This new construction mode has special requirements for lifting machinery. Jianglu QTZ400 tower crane won the bid with its excellent performance. As the only tower crane brand cooperating with the project, Jianglu heavy equipment Co., Ltd. has paid great attention to the collision since the beginning of the project, and has designed the tower crane installation scheme with high efficiency and quality in a short time, providing special attachment scheme and other technical support, which provides a solid backing for the smooth completion of the project. The excellent performance of Jianglu tower crane in this project is shown under the changes of paste assembly and time flow, which shows the excellent quality of the old tower crane and creates the "Chinese speed" in the field of engineering hoisting

Copyright © 2011 JIN SHI